

I haven’t posted for a while but I have been beavering away. Puppet armatures made – check. Set built – check. Set props made and set dressed – check. Animation scheduled, sectioned and blocked – check. Dedicated animation PC desktop bought – Check. Dragonframe installed – check. Camera settings sorted – check. Lights pressie for Christmas set-up – check. Now it’s just 30 hrs. of animation to completion 🙂 DEADLINE March 10th – See you on the flip side
Discover more from | Creative Blog
Subscribe to get the latest posts sent to your email.
